

Underground Mining
Block cave—pre-conditioning
Block cave—pre-conditioning.
Block cave—pre-conditioning.
WebGen™ wireless initiation technology transforms pre-conditioning by eliminating the operational constraints of wired systems, enabling safer, more efficient and predictable blasting outcomes.
Accelerated pre-conditioning cycles
Traditional pre-conditioning is resource-intensive and prone to delays from wire damage, leakage, and misfires. WebGen™ allows for pre-loading of blast holes without physical connections, enabling remote initiation and reducing the need for rework. This results in faster cycle completion and improved cave readiness.
Simplified bench configuration
The wireless system removes the requirement for back-up detonators and complex stemming procedures. With no in-hole wiring, the risk of leakage and misfires is eliminated, reducing variability in blast performance and simplifying bench setup. This leads to more consistent fragmentation and improved downstream handling.
Enhanced safety and operational control
WebGen™ enables remote initiation from a safe location, removing personnel from hazardous areas such as the rill or brow during charging and firing. This significantly reduces exposure to geotechnical risks and improves compliance with site safety protocols.
4D™ supports longer hole charging and reliable performance in wet conditions, improving cave readiness
Solution powered by

Blasting Solutions
WebGen™ wireless initiation system

Digital Solutions
SHOTPlus™ advanced blast design and modelling software

Blasting Solutions
4D™ Bulk System
Delivering value where it matters.
Delivering value where it matters.
Increased cycle time
- Anticipate increased time savings on pre-conditioning cycle.
Simplified bench operations
- Elimination of back-up detonators, simplified pre-stemming, no leakage and no misfires.
Improved safety
- Reduced exposure in hazardous areas.
Pre-conditioning in block cave mining is resource intensive and presents operational issues with wire leakage and misfires.
A wireless solution can reduce complexity of the drill and blast process, remove people from hazardous areas and complete the mining cycle faster.
This component was not configured properly, please select either current page tags or select tags and the search configuration
Orica's industries

Industry
Agriculture

Industry
Civil infrastructure

Industry
Construction

Industry
Energy

Industry
Iron ore

Industry
Oil and gas

Industry
Quarrying

Industry
Surface coal

Industry
Surface metal

Industry
Underground construction and tunnelling

Industry
Underground mining
Want to know more about this solution?
Want to know more about this solution?
Contact an expert by completing the form.
